Double Flap Grey Soft Close Seat - Suit Wellbeing Toilets
Double Flap Grey Soft Close Seat - Suit Wellbeing Toilets
Order Code: WBS-S004
Couldn't load pickup availability
Product description
Double Flap Grey Soft Close, Quick Release Toilet Seat - Suit Wellbeing Close Coupled and Wellbeing800
Key Selling Points
- Compact Gloss Grey double flap soft close quick release toilet seat
- Made from urea-formaldehyde a premium material that is hard, stable, and scratch-resistant.
- Adjustable hinge
- Seat measures 363mm (w) x 425mm (l)
- Suitable for models
- WB-WCCCBTW-SH
- WB-WCCBTW-RH
- WELLBEING800BTW-SH
- WELLBEING800CCWC-RH
- Includes hinges and fixing bolts
- Certifications
- Health Approved - AU
- Materials
- Urea
BIM Files
Brochures
Dimensional Drawings
Product Information

