1
/
of
2
Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite
Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite
Order Code: WBS-WCCCWBTW-S
Couldn't load pickup availability
Product description
Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite
Key Selling Points
- White double flap soft close quick release toilet seat
- Made from urea-formaldehyde a premium material that is hard, stable, and scratch-resistant.Â
- Suitable for models
- WB-WCCCBTW-SH - Wellbeing Back-to-Wall Close-Coupled Toilet Suite, standard height
- WB-WCCCBTW-RH - Wellbeing Back-to-Wall Close-Coupled Toilet Suite, raised height - Includes hinges and fixing bolts
- Materials
- Urea
BIM Files
Brochures
Dimensional Drawings
Product Information
