1
/
of
3
Fixing Bolts for Type A Wash Basin
Fixing Bolts for Type A Wash Basin
Order Code: WBS-BSNTYPA-HFK
Couldn't load pickup availability
Product description
Spare Parts: Fixing Bolts for Type A and Type B 550mm Wash Basins. Used to fix wall hung basins to the wall securely.
Key Selling Points
- Suitable for wall hung basins
- Contains
- 2 x galvanised steel bolts M10 x 120mm extra long
- 2 x wall fixing plugs
- 2 x Steel nuts
- 2 x large round metal washers
- 2 x plastic washers
- Certifications
- Health Approved - AU
- Materials
- Nylon,Steel
BIM Files
Brochures
Dimensional Drawings
Product Information
