Microtrap 40mm - Pop Up
Microtrap 40mm - Pop Up
Order Code: WBS-S010
Couldn't load pickup availability
Product description
Micro trap to suit the specific needs of health and aged care applications.
Key Selling Points
- Compatible with all Enware wash basins
- Brass Pop-Up plug
- Ideal for accessible applications
- Provides additional space in a vanity unit
- Supplied in chrome body finish as standard
- Material: chrome plated brass / PVC
- Certifications
- A&A - AS1428.1 Accessible
- Finish
- Chrome
- Materials
- Brass
BIM Files
Brochures
Dimensional Drawings
Product Information

