Skip to product information
1 of 2

Microtrap 40mm with Plug and Waste

Microtrap 40mm with Plug and Waste

Order Code: WBS-S009 Coming Soon

Product description

Micro trap to suit the specific needs of health and aged care applications.

Key Selling Points

  • Compatible with all Enware wash basins
  • Brass Grate and PVC plug 
  • Ideal for accessible applications
  • Provides additional space in a vanity unit
  • Supplied in chrome body finish as standard
  • Material: chrome plated brass / PVC

Certifications
A&A - AS1428.1 Accessible
Finish
Chrome
Materials
Brass,PVC

BIM Files

    Brochures

      Dimensional Drawings

        Product Information

        View full details

        Alternatives

          Spare Parts