1
/
of
2
Single Piece Chrome Plated Basin Waste
Single Piece Chrome Plated Basin Waste
Order Code: WBS-BSNTYPA-WSTD
Couldn't load pickup availability
Product description
Single piece chrome plated brass waste, suitable for all vitreous China basins with 32mm or 40mm waste outlets.
Key Selling Points
- Chrome plated brass construction
- Suitable for 32mm or 40mm waste basin outlets
- Suitable for basins without an overflow
- Single piece; saves installation time.
- Finish
- Chrome
- Materials
- Brass
BIM Files
Brochures
Dimensional Drawings
Product Information
