Skip to product information
1 of 3

Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite

Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite

Product Code: WBS-WCCCWBTW-S

Product description

Double Flap White Soft Close Seat - Suit Wellbeing Back-to-Wall Close-Coupled Toilet Suite

Key Selling Points

  • White double flap soft close quick release toilet seat
  • Made from urea-formaldehyde a premium material that is hard, stable, and scratch-resistant. 
  • Suitable for models
    - WB-WCCCBTW-SH - Wellbeing Back-to-Wall Close-Coupled Toilet Suite, standard height
    - WB-WCCCBTW-RH - Wellbeing Back-to-Wall Close-Coupled Toilet Suite, raised height
  • Includes hinges and fixing bolts

BIM Files

    Brochures

      Dimensional Drawings

        Product Information

        View full details