1
/
of
6
Double Flap White Soft Close Seat - Suit Wellbeing Wall Faced Toilet Pan
Double Flap White Soft Close Seat - Suit Wellbeing Wall Faced Toilet Pan
Product Code: WBS-WCWFP-S
Couldn't load pickup availability
Product description
Double Flap White Soft Close Seat - Suit Wellbeing Wall Faced Toilet Pan
Key Selling Points
- White double flap soft close quick release toilet seat
- Made from urea-formaldehyde a premium material that is hard, stable, and scratch-resistant.
- Suitable for models
- WB-WCWFP-SH - Wellbeing wall faced pan, standard height
- WB-WCWFP-RH - Wellbeing wall faced pan, raised height
- WELLBEING800BTW - 800mm wall faced rimless pan, where AS1428.1 compliance is not required
- WELLBEING800CCWC - 800mm close-coupled toilet suite, where AS1428.1 compliance is not required - Includes hinges and fixing bolts
BIM Files
Brochures
Dimensional Drawings
Product Information
